|
 |
 |
TRANSPORTATION |
CROSSING HURDLES.
CONNECTING PEOPLE.
CONVERGING LIVES. |
|
|
|
|
| |
| Home » Areas of Specialisation » Transportation » Bridges |
 |
 |
BRIDGES
|
With more than a thousand bridges connecting India,Gammon has expertise in the design, engineering and building of bridges. The range includes Arch and Bowstring Girder Bridges, Cable-Stayed Bridges and Balanced Cantilever Bridges to name a few. The Delhi-Noida Toll Bridge was completed using Elevated Prestressed Segmental Construction methods. The Company is adept in the techniques of launching Underwater Concreting, developing supporting equipment like Pneumatic Caissons, Winches, Cables and Grouting Machinery, as well as building supporting structures.
Some of the bridges built by Gammon in the 1930’s still stand the test of time; evidence of our technological excellence.
|
| |
AWARDS |
- 1998 ICI-MC Boucheme Award for the Most Outstanding Concrete Structure - Jadukata Bridge
- IFAWPCA Gold Medal - Thane Creek Bridge
|
| |
| |
| |
 |
JADUKATA BRIDGE |
 |
Ranikor, Meghalaya
River: Jadukata
Client: Meghalaya Public Works Department
140m Single Span Prestressed Concrete Cantilever Bridge.
|
 |
|
|
| |
|
 |
VIDYASAGAR SETU |
 |
Kolkata, West Bengal, India
River: Hooghly
Client: Hooghly River Bridge Commissioners
Long-span cable stay bridge founded on wells. Main span 457m. Deck width 35m. Concrete foundations and piers. Structural steel superstructure girders. 823m in
length. 22m base diameter.
|
 |
|
|
| |
|
 |
PAMBAN BRIDGE |
 |
Rameshwaram, Tamil Nadu, India
Strait: Pamban Strait
Client: MORTH through Tamil Nadu Highways Department
The longest road bridge across the open sea. Prestressed concrete superstructure. 100m navigation span. Reinforced concrete piers. Constructed in dangerous shark infested waters. 2.5km in length.
|
 |
|
|
| |
|
 |
EXTRA DOSED BRIDGE AT INDRAPRASTHA |
 |
Delhi, India
Across 8 Railway Tracks
Client: Delhi Metro Rail Corporation
The first Extradosed Bridge in India and the second of its kind in the world. Across
5 railway lines that experience high-density traffic.
|
 |
|
|
| |
|
 |
DELHI NOIDA BRIDGE |
 |
Delhi, India
River: Yamuna
Client: Mitsui Marubeni Corporation
Construction of Main Bridge across river Yamuna. Grade separated interchange at Delhi and Noida end . Under Pass for Bund Road - Noida. Civil Works for 22 lane toll Plaza. Pile foundation, PSC Superstructure box segmental.
|
 |
|
|
| |
|
 |
MAHATMA GANDHI SETU |
 |
Patna, Bihar, India
River: Ganges
Client: Public Works Department - Govt. of Bihar
The longest river bridge in the world in the 80’s. 5.575km in length. 120m main span. 46 spans of 121.065m each & 2 spans of 63.53m. Pre-cast segment assembly by epoxy glue. Superstructure constructed by cantilever segmental construction
method. 100 tonne capacity crane designed and fabricated.
|
 |
|
|
| |
|
|
|
|