Bridges & Flyovers
|
| Mahatma Gandhi Setu,
Patna - 1982 |
 |
Design & Construction of 5.575 Km long
bridge comprising 46 spans of 121.065M each and 2 spans of 63.53M
at each end. The deck provides for a 7.5M wide 2 lane roadway for
IRC class 70 R loading with 2M wide footpaths on either side. The
super structure is constructed by cantilever segmental construction
method.
|
 |
| Ganga Bridge at Buxar,
Patna - 1969 |
| Design & Construction of 1122M long
prestressed concrete bridge comprising 11 nos. cantilever spans of
101.0M each resting on RCC piers and caisson foundations. |
 |
| Narmada Bridge at Zadeshwar,
Gujarat - 1977 |
| Design & Construction of 1350M long
prestressed concrete bridge consisting of 13 double cantilever spans
of 96M each & 2 end spans of 48M each with roadway. |
 |
| Delhi - Noida Bridge
Project, Delhi - 2000 |
- Construction of following bridges & structures
- Main Bridge across river Yamuna
- Grade separated interchange at Delhi end
- Grade separated interchange at Noida
- End Under Pass for Bund Road -Noida
- Civil Works for 22 lane toll Plaza
- Pile foundation, PSC Superstructure box segmental.
|
 |
| Elevated Structure Viaduct
from Tilak Nagar - Dwaraka Section of Line no.3 for DMRC-3C 23, Delhi
- 2005 |
- Total Length of Viaduct : 6.556 Km
- Total no. of Piles: 1205 of dia 1500mm
- Total no. of Piles : 44 of dia 1200mm
|
 |
| Bangalore Grade Separator,
Bangalore - 2003 |
|
Construction of Grade Separator (Interchange) at Outer Ring Road(ORR)-National
Highway No.7, Intersection at Hebbal, Bangalore. ]
Main features of the project are:
- Total Length: 5.23km
- Total Length of Pile: 14330.33 RM
- Total no. of piles : 976.
|
 |
| Urban Viaduct between
J J Hospital and Paltan Road Section, Mumbai - 2002 |
Construction of 2.4 km Long Viaduct, 16.20m wide dual
carriageway.
- Longestelevated road in Mumbai
- First elevated road in Maharashtra
- Flyover constructed by using precast segmental technology
- Electrification below flyover deck Super structure erection
of one span completed in period of 15 days. Capacity of individual
pile 500 Mton. High strength M75 concrete used for the first time
- Uplift bearing first time made & used in India
|
 |
| |
Bridges
& Flyovers | River Creek
Bridges | Special Bridges
Tunnels & Aqueducts | Roads & Highways |
Railways |