| Haldia Jetty: Inlet
jetty for Haldia water supply scheme - 1979 |
 |
| 50m long jetty with RC monolith & RC deck on tubular
steel driven piles. The Depth of the pile exceeds 30m in length. Work
Scope also included construction of pump house, outfall structure
and small substation. |
|
| Cochin Slipway - 1992 |
- 94 m long slipway having a downward slope of 1:14 with the
tip 5 m below the water level & surfacing 0.5 m above water
level, 84m long warping jetties on each side of slipway, mooring
jetties 15 m beyond the warping jetties involving 600 MT of sheet
piling all complete with capstan, bollards and fenders including
rails for the full length of the slipway for hauling up of vessels.
- Pump House, compressor room, winch room structure, workshop
structure and 18m tall cover shed in steel for repairing ships.
|
 |
| Paradeep Port: Second
Cargo Berth & sheet Pile Wharf for wet basin at Paradeep - 1983 |
| 300 m long Cargo berth consisting of a long arm of
200m and short arm of 100 m founded on piles (racker as well as vertical)
and Diaphragm walls. The wet basin consists of a long arm of 100 m
and a short arm of 50m founded on precast piles. |
 |
| Dharamtar Jetty - 2001 |
- Construction & Extension of Jetty and its approach at Dharamtar
Creek.
|
 |
| Sohar Jetty - 1982 |
| 1410 m long jetty founded on 600 mm dia. X 31 m long
piles, pump station, mooring dolphins & walkways, complete with
mooring bollards, fenders and ladders at Jetty. |
 |
| Kandla Jetty - 2000 |
| Const. of Jetty superstructure over piles, Mooring
Dolphins, Breasting Dolphin, Walkways, Approach, Control Tower, Pump
House, Office building etc. |
 |
| Design & Construction
of Vizag Berth - 2004 |
| Design and Construction of two multipurpose berths
EQ8 & EQ9 including mechanical and electrical works at Vishakapatanam
which is the biggest port in India. |
 |
| Design & Construction
of Dolphin Jetty RM-5 & RM - 6 - 2004 |
| Each jetty consists of breasting dolphins, mooring
dolphins, loading/ unloading platform, access bridge, approach way
and pipe way which shall be equipped with all loading arms, fender
system, piping & related hardware, power supply & lighting,
fire fighting equipment. Both these dolphin jetty berths are designed
and planned for 30000 DWT oil tankers. |
 |