| Major Building / Commercial
/ Industrial Structures |
| Beary's Lakeside Habitat,
Bangalore - 2006 |
 |
| 24 storied twin towers connected by steel
bridge at 15th floor, comprising of 3.50,000 sq.ft of built up area.
RCC Framed Structure with underground basement. Civil work pertaining
to swimming pool, STP, club house. |
 |
| Academic Complex, Library
Building and Computer Centre Building for IIT at Guwahati - 2005 |
| G+3 RCC framed Structure, Library Building,
,Computer Centre Building, Academic Complex - 74045 sqm, Library and
Computer centre Building - 12546 sqm, Land Development, Internal Electrification,
external cladding and water proofing work, Sanitary and wate. |
 |
| 900 LIG Houses at Bakkarwala
Pkt. B-1 (DDA -Mass Housing Project), Delhi - 2004 |
| Work involves 900 dwelling units of LIG
type of area about 25-30 Sqm each. Total 50 buildings of five storey
each of 16-20 dwelling units. |
 |
| Civil works for Raw
Material Handling Plant and Sinter Plant at Duburi, Orissa - 2001 |
| It includes construction of Stock house,
coke fine building, junction house , conveyor galleries, truck hopper,
flux crushing building, galleries. |
 |
| Multilevel Container
Freight Station, Dronagiri, Navi Mumbai - 2000 |
Construction of G+1 storied Warehouse,
G+1 Administrative Block, Token office, internal roads and other miscellaneous
buildings. Built up area - 60000 sqm.
|
 |
| Fortune 2000 Building,
Mumbai - 2000 |
Multistoried commercial bldg, including
basement, G + 7 Built up area - 13983 sqm.
|
 |
| New Note Press Building
for RBI, Salboni - 1998 |
| Construction of Main Plant Building / AC
Plant Building Phase - II |
 |
| Sub Station & Satellite
Rack Room Buildings for various Utilities for MRPL-II Expansion Project
- 1998 |
| Construction of Substation and Satellite
Rack room buildings for various utilities. |
 |
| Cement plant for TISCO
at Jojobera - 1994 |
- Construction Plant bldg. 2 storeys, 43 M (L) x 25 M (W) x 23
M (H), on RCC structure on open foundation with roofing of RCC
slab
- Construction of 8 silos using slip form technique as follows:
- Cement silos 3 Nos. 15M Ø x 52M h
- Clinker silo 1 No. 25 M Ø x 50 M h
- Dry slag silo 3 Nos. 13M Ø x 39M h
- Ground slag & Clinker silo 1 No. 10 M Ø x 34 M h
|
 |
| Nhava Sheva Bulk Handling
facility - 1989 |
- Design & Construction of 4 Horizontal silos Fertilizer bulk
storage shed (2 Nos.) , 43 M(w) x 21 M(H) x 499 M (L)
- Food grain bulk storage and sulphur bulk storage (1 each), 42
M (w) x 21.5 M (H)x 499M (L)
- Fertilizer bay storage shed 36 M (w) x 18.4 M (H) x 350 M(L)
- Wagon bag loading shed (1 No.) 36 M (W) x 18.4 M(H) x 730 M
(L)
|
 |
| Andheri Sports Complex
- 1989 |
| Construction of Olympic standard swimming
pool with spectators gallery, 5 lawn tennis courts, sports training
center with facility for indoor games such as squash, badminton, basketball,
gymnasium and also providing for dormitory accommodation for trainees. |
 |
| Paradeep DAP Plant,
4 Trains & Aux. Facilities - 1986 |
Construction of Civil works comprising
:
DAP plant A & B Trains with scrubber area (30M (L) x 11 M(W)),
Raw material storage building (130M long x 30 M wide), and Auxiliary
facilities etc.
- Foundation pad for fuel oil tank
- 11 KV substation bldg.,
- Inter link area . DAP Plant C & D Tra
|
 |
| Kudremukh Iron Ore Project
- Pellet Plant - 1981 |
| Civil and piling work for the filter building,
shops and warehouse, office building, main substation, fire station
, water treatment plant, thickness conveyor gallery and transfer towers,
surge silo and. |
 |
| Desalination Plant -
Dubai - 1980 |
Erection & installation of 5 units
of 13,000M³ per day desalination plant. Total tonnage of machinery,
equipment erection approx. 9,000 MT comprising:
- Evaporators-5 Units, each weighing about 1220 MT.
- Machinery & Equipment- about 1000 MT
- C.S., S.S.epoxy & rubber lined piping about 500 MT.
- Insulation involving approx.10,000 M² area
- Electricals
- Transformers, panels, Cabletrays H.V. & L.V. cables grounding
etc. complete instrumentation-panels, instruments, cables, air
piping etc.
- Painting - approx. 60,000 M²
|
 |
| Terminal Bldg. for Sarjah
Airport - 1978 |
| Construction of main dome 48 M dia x 20
M high, Arrival & Departure domes 30 M dia x 16 M high. VIP dome
14 M dia x 7.5 M high above first floor level, Control tower 35 M
high. |
 |
| Textile Unit for DCM
- 1972 |
| Construction of two main wings & a
link bldg. Each wing consisting of 14 frames of 45M span twin bowstring
girder/shell roofs of hollow prestressed concrete box girder string
suspended by RCC suspenders from the concrete arch. Total area 35,400M². |
 |
| Bimal Mill - 1962 |
| Construction of mill measuring 165M x 108
M to provide a covered area of 17820 M². The roof consists of
precast reinforced concrete slabs supported on prestressed concrete
secondary beams which in turn are carried by reinforced concrete box
girders of 22. |
 |
| Santacruz Hanger - 1957 |
| Construction of Prestressed concrete structure
with an unrestricted floor area of 101 M x 46 M and vertical clearance
of 15M.The hanger roof consists of 10 barrel shells of 45M span x
9M chord width and is supported by a frontal beam in prestressed concrete. |
 |
| Chalakudi Textile Mill
|
| Construction of 150 bays of 7.6 M x 15
M with shell roof to provide a covered area of 2.5 lac sq.m. The shell
roof is insulated by A.C. Trafford sheets fixed to small concrete
spacer blocks leaving a continuous air space of leaving a continuous
air space of 4 inches. |
 |
| |
|
Major Building / Commercial
/ Industrial Structures | TV Towers
|